Wednesday, May 6, 2020
Upgrade of Network of Pharmaceutical Company
  Question-  Q1.Design a work break down structure (WBS) for this project with milestones?Q2. What are the key risks and how would you manage them?Q3. What are the key quality criteria which will be relevant here, outline the area/task, metrics and their measurement?Q4. The total budget for this is 65,000, of which 30,000 is set aside for the software. Explain how you will plan to use this money?      Answer-  Table of Content  Project Title  Environment And Present Working System  Aims/Objectives Of The Project  Investors  Advantages Of The Project  Development Team  Results To Be Expected  Work Breakdown Structure  Milestones  Management Of Risks  Quality criteria  Cost estimation  Conclusion  References  Environment And Present Working System  A proper network infrastructure is extremely significant due to it being highly reliable as well as tough. The pharmaceutical company has decided to upgrade/modify its present network foundation. As a result of which, there is a need of up gradation of the network structure which will be done by changing the present hardware, new workstations, networks and services. This needs to be done in such a way that it supports both the existing demands and out future expansion plans of the company. In agreement, the plan for the project has been enclosed. It includes all details of the network structure, including the criterias of success that is required for the achievement of goals. As an add-on, the plan has been devised in such a way that no disruption of the present network is done while the upgrading of the network is taking place. So, the collaboration has to be done with a set of company resources, which have done work on such projects. While the upgrading is taking place, one importa   nt fact should be taken care of  there should be minimum investment from companys side while the returns should be at a maximum level.    Aims/Objectives Of The Project  The main goals of the project are as follows-    The architecture of the network should be improved so that it allows a constant and the incessant flow of information  Security of data access for the users needs to be improved  Facilitation of day-to-day to operations needs to be made easier  The integrity of the company data needs to be maintained  The employees of the company need a boost in their confidence level    Investors  The interested parties of the project are-    Sponsors of the projects  Hardware retailer  Human resources  Foundation retailer    Advantages Of The Project  Some of the key benefits that the project will enjoy are -    Involvement of the customers to be increased  Network communications to be increased  Theft of data to be decreased  All students are allowed fair usage  The upgrading is aimed at the elimination of all loopholes and errors that are present within the activity system and thus, create an error free system that would help with the goal of expansion.        Development Team  Industrial team    Analyst of the network  Operational engineer  Network Engineer    Nonindustrial team    Manager of functionality    Results To Be Expected    Enrollment to increase  Introduction towards bigger opportunities  Introduction towards diversified areas of studies    Preliminary Approximation Of Costs    Hardware/system - $200  Network cable/meter - $20  Software  Manager of the project - $90/hour  Analyst of the network - $75/hour  Implementation Engineer - $70/hour  Network Engineer - $60/hour  Functional Manager of Human Resources - $80/hour  Estimated entire cost of project - $122,800    Work Breakdown Structure          WBS      Task Name          1      Network Upgrade          1.1       Plan          1.1.1       Prepare project plan          1.1.1.1       Analyze requirements          1.1.1.2       Perform feasibility study          1.1.1.3       Get sign-offs on deliverables          1.1.2       Take backup          1.1.2.1       Identify backup location          1.1.2.2       Perform backup operation          1.2       Analyze  Design          1.2.1       Hardware sizing          1.2.1.1       Market research for best configuration of machines          1.2.1.2       Finalize detailed configuration of network          1.2.1.3       Prepare bill          1.2.1.4       Sign-off          1.2.2       Finalize new furniture          1.2.3       Purchase furniture          1.2.4       Place furniture          1.2.5       Vendor selection          1.2.5.1       Raise tender for workstation procurement          1.2.5.2       Prepare vendor selection criteria          1.2.5.3       Identify vendor for workstation purchase          1.2.5.4       Configuration  Setup          1.3       Purchase  Store          1.3.1       Perform quality test on selected workstations          1.3.2       Store machines in warehouse          1.3.3       Install          1.3.3.1       Identify locations of machine          1.3.3.2       Install the hardware on the identified machines          1.3.3.3       Identify and install network server          1.3.3.4       Locate router          1.3.3.5       Connect machines          1.3.3.6       Configure workstations for internet connectivity          1.3.3.7       Update software on machines          1.3.3.8       Test software updates          1.4       Testing          1.4.1       Test each machine          1.4.2       Get signoffs          1.4.3       Network testing          1.4.3.1       Put the machine in the network and test          1.4.3.2       Get signoffs          1.4.4       Data restore            Milestones    Preparation of project plan  Hardware sizing  Vendor selection  Backup  Raise invoice  Installation  Machine test  Network testing    Management Of Risks          Name of Risk       Explanation      Level of Risk      Influence      Process of Contingency/Mitigation          Job Description lacking details      Set of skills is quite vague      Low      Medium      Have an expert of the industry to review it          Allocation of resources is insufficient      Minimum limit of resources is not achieved      Low      Medium      Resources of other tasks are to be assigned here          Disapproval of client      Discrepancy between the point of view of client and project      Medium      High      Personal meetings with clients to be arranged          Client Requirements are improperly projected      Discrepancy between the point of view of client and project      Medium      High      Industry expert to review the problem          Network analyst missing      Analyst quit or on leave      Low      High      Another analyst to be hired          Documentation loss      Failure of Hard Disk Drive      Low      High      Data recovery to be done with the help of IT tools          Increase in the license fees of design tools      Discount season has ended      Low      Low      Alternate freeware tools to be sought after          Absence of Implementation engineer      Engineer quit or on leave      Low      High      -Another engineer to be hired  -Implementation engineer to be hired on a contract  -Other resources to be reassigned          Absence of Network Engineer      Engineer quit or on leave      Low      High      -Another engineer to be hired  -Implementation engineer to be hired on a contract  -Other resources to be reassigned          Standard configuration of network is lacking      Proper documentation is lacking      Low      Low      Industry expert to review the problem          Software cost is increased      License fees are increased      High      Low      Alternate freeware tools to be sought after          User disapproval      User acceptance testing faces hiccups      High      High      Personal meetings with clients to be arranged          User reviews are facing delays      Reviews are not presented on schedule      Low      High      Notifications are to be sent            Quality criteria  A set of measurable values which are associated with quality of the product is typically referred to as products quality metrics. Similarly, a softwares or a systems quality metrics could be used to determine the extent to which the system or the software meets the requirements of the business. The usage of quality metrics raises objectivity of evaluation of the product quality. The human evalution of quality is subjective therefore its a possible source of disagreement between the system provider and the users. Thus the measurement of these qualities should not be only prepared at the end of project but more importantly during the projects execution.  Typically, a systems metrics are measured in the following terms:    Reliability: The total amount of time the system is operational. Its measured in percentage for instance 23 out of 24 hours i.e., 100 x 23/24.  Recoverability: The total amount of time the system uses to recover from a failure. This could measured in total duration it takes for the system to spring back online for instance 30 minutes to reeinitialize the system.  User friendliness: The amount of complications involved with the system as a setup, its usage and maintenance. It could be simply measured in say, the amount of time a new user takes to get accustom to the system.  On-Time: Another key system metric is the timed delivery of the entire project. This measurement of the project being on time is particularly important ot the management as well as the stakenholders each day by which the project goes beyond its scheduled delivery and funds. A key metric for this is to ensure that the entire prpoject as per terms of project management is meeting its initial goal timings.  Within Budget: All projects in IT cost money to develop, evaluate and deliver. It is therefore critical for the project managers to manage budget metrics by continously monitoring and reviewing the on-going project spending. This simply could be done by keeping a track of the projected expenditure prepared during the drafting of the plan and the actual amount being spend on the project at the given time. This thus will give a quick glance to the project manager whethere the projects spending is on par, above or below the budget. If its on par or under the budget, then chances are everything is going well, however when it goes above the budget, then arrangements for additional funds has to be made. This would then either be secured by way of loans, credit from promoters etc.  Deliverables Tracking: Another key criteria is deliverable tracking. The main goal of starting a new IT project is to deliver new enhancements or new functionalities to the current environment. Therefore a project management metric within the IT projects is to make sure that the project deliverables would be completed by date and within its proposed budget. The key metric here for tracking the deliverables is to review the total progression of the tasks corresponding to delivery milestones and doing the necessary if they do not meet the required expectations.    Cost estimation  The time-phased budgeting is the core of the cost estimation. The time-phased budgeting technique does the job of integrating the schedule of the project and also, the budget of the project. This method acts as the stepping-stone towards making the budgetary. There is no relation between budget and schedule of a project until the two are merged together. Once time-phased budgeting is done, the manager of the project gains the added capacity to further point out the time at which the occurrences of certain expenditures take place. The outflow of cash is more accurately depicted which can result in the appropriate planning being undertaken.            Activity      Estimate Date      Cash Inflow      Cash Outflow      Balance          Preparation of project plan      Thu 2/5/15      35000      2160      32840          Hardware sizing      Tue 2/17/15            4560      28280          Vendor selection      Thu 2/19/15            6100      22180          Backup      Fri 2/6/15            600      21580          Raise invoice      Thu 2/19/15            7400      14180          Installation      Mon 8/25/14            2440      11740          Machine test      Thu 9/25/14            3960      7780          Network testing      Fri 10/3/14            920      6860            Conclusion  The principles of PMBoK have been respected while the upgrading of the companys IT infrastructure is being done and on the basis of this, the manager of the project is able to determine the requirements and exclusions that are needed to be done in the project. At the time of the up gradation, this might affect the functionality of the other departments and thus time, resources and budget are of critical importance.    References  Gulla, J. (2012, Feb). Seven Reasons IT Projects Fail.  Organizing for Project Management. (n.d.).  Duncan, W.R. (n.d) A guide to Project Management Body of Knowledge.  Hamilton, G. (n.d.). Risk management and project management go hand in hand.  HubPages. (n.d.). Project Management Time  Cost Estimation Techniques: An Overview.    
Subscribe to:
Post Comments (Atom)
 
 
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.